Jump to content
Now you can advertise your business on Top Gold Forum.
Sign in to follow this  
Rose123456

Looking for Investment for your Retirements?

Recommended Posts

TORONTO, ON – September 5, 2019 - Anaconda Mining Inc. ("Anaconda" or the "Company") (TSX: ANX)
(OTCQX: ANXGF) is pleased to provide an update on the Tilt Cove Gold Project (“Tilt Cove”), located within the Baie
Verte Mining District in Newfoundland, approximately 45 kilometres by road from the Company’s Pine Cove Mill
(Exhibit A). Tilt Cove is a large land package along the same geological trend as the past producing, high-grade Nugget
Pond Mine, which had an average recovered grade of 9.85 g/t gold. Tilt Cove covers a 20-kilometre strike extent of the
Betts Cove Complex, a highly prospective geological terrane including the Nugget Pond Horizon, the ironstone unit that
hosts the Nugget Pond Mine (Exhibit A). The Company currently plans to drill 4,000 metres of diamond drilling starting
in the fourth quarter of 2019.
Since the Company announced the expansion of its footprint at Tilt Cove on May 9, 2019, key geological characteristics
of the Nugget Pond Mine have been identified and used to guide a work program focused on providing the specific data
required to evaluate and prioritize exploration targets. The Tilt Cove work program to date includes the following
milestones:
• Identified 12 exploration targets based on historical exploration data (Exhibit A);
• Collected 569 prospecting rock samples and 2,192 soil samples;
• Initiated a detailed drone-magnetic survey (455-line km) over the Nugget Pond Horizon;
• Completed a LiDAR survey over the entire project area (196 km2
);

• Conducted a review of available drill core and relogged 13 diamond drill holes from the Nugget Pond deposit;
• Received all required exploration and drilling permits; and
• Expanded the prospective Tilt Cove land position to 6,075 hectares.
Upon receipt of all prospecting and soil sample assays and geophysical data sets early in Q4 2019, Anaconda will conduct
a full evaluation of all available data to determine the highest priority targets prior to drilling.
“We have identified twelve exploration targets to date and have located more prospective areas based on our geological
mapping and prospecting. We will continue with our data acquisition which, in combination with historical data will
allow us to fully evaluate and prioritize exploration targets and develop specific drill targets. Given the history of past
production at the high-grade Nugget Pond Mine, our large land position in this highly prospective area and proximity

to our operating Pine Cove mill and tailings facilities, we believe we are in a unique position to make the next high-
grade gold discovery in the prolific Baie Verte Mining District.”

~ Kevin Bullock, Chief Executive Officer, Anaconda Mining Inc.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
Sign in to follow this  

  • Popular Contributors

  • Similar Content

    • By trusthyips
      USDSOLVE
       See the attchment for payment proof.
       You can invest here 100% surely. 
      Join here: https://usdsolve.com//?ref=trusthyips786
      Usdsolve is a trusted investment website.
      ## Min/Max: 10/NO Limited.##
      @@ 5% Daily Profit For 3 Days 
      - 6% Daily Profit For 7 Days 
      - 7% Daily Profit For 10 Days 
      - 80% Profit After 10 Days 
      - 100% Profit After 15 days 
      - 230% payout After 25 Days. @@@
      +++Have a principal back After complate plan+++++
      Ref: 20-10-1
      Payment: Manual. But payment sent in 30 minit.
      https://usdsolve.com//?ref=trusthyips786
       

    • By karen145245
      Abcourt Mines Inc. (TSX-V: ABI, Berlin: AML-BE and Frankfurt Stock Exchanges: AML-FF)
      (“Abcourt” or the “Mines Abcourt Inc.) announces that a technical report NI 43-101 entitled
      Feasibility Study on the Sleeping Giant Project was prepared by PRB Mining Services Inc. of Val-
      d’Or, Quebec, Canada.
      Here is a summary of this technical report(1):
      General and History
      The Sleeping Giant mine is located 80 km north of Amos in north-western Quebec, Canada. It is
      accessible via road 109 that connects Amos to Matagami. This is a paved road and it passes less
      than 1 km from the mine site. Material and services are available at competitive prices.
      The mine was exploited from 1988 to 2014. It has been maintained dry since its temporary closing
      in 2014 and no infrastructure has been taken out or added. Currently, the Sleeping Giant mill treats
      ore from the Elder mine owned by Abcourt Mines Inc. and occasionally, some custom ore. The mill
      capacity is 700 to 750 tonnes per day. The activated carbon process is used to recover gold.
      Historically, the gold recovery on the Sleeping Giant ore, at that mill is 97.5%.
      The tailings pond complies with all governmental regulations and the dykes and the quality of water
      are checked every year by an external expert. The tailings pond has enough capacity to receive
      the tailings from Elder and those from the Sleeping Giant mine as indicated in section 16 of the
      technical report. The setting pond at the discharge of the tailings pond is used to treat the
      discharged water according to the rules and to control the quality of the water.
    • By karen145245
      TORONTO, ON – September 4, 2019 - Anaconda Mining Inc. ("Anaconda" or the "Company") (TSX: ANX)
      (OTCQX: ANXGF) is pleased to announce results from 18 diamond drill holes (BR-19-72 to BR-19-76 and BR-19-86
      to BR-19-97 and BR-19-99) drilled in the East Goldbrook Gold System (“EG Gold System”) at the Goldboro Gold
      Project in Nova Scotia ("Goldboro"). The 4,391 metres of diamond drilling were part of a recently completed 5,734-
      metre diamond drill program announced on February 28, 2019 and were designed to infill portions of the EG Gold
      System (6 drill holes) to upgrade resource categorization (the “Infill Drill Program”) and to extend the EG Gold System
      (12 drill holes) east of the 2018 resource model limits at Section 9550E (the “Extension Drill Program”) (Exhibit A, B
      and C).
      Selected composited highlights from the recent Infill Drill Program include:
      • 50.60 g/t grams per tonne ("g/t") gold over 1.0 metre (246.0 to 247.0 metres) in hole BR-19-89;
      • 12.23 g/t gold over 2.0 metres (214.3 to 216.3 metres) in hole BR-19-89;
      • 6.03 g/t gold over 2.9 metres (200.7 to 203.6 metres) in hole BR-18-90;
      • 72.40 g/t gold over 0.6 metres (21.0 to 21.6 metres) in hole BR-18-87; and
      • 32.62 g/t gold over 0.9 metres (290.7 to 291.6 metres) in hole BR-18-87.
      Selected composited highlights from the recent Extension Drill Program include:
      • 27.12 g/t gold over 2.5 metres (51.3 to 53.8 metres) in hole BR-19-97 including 133.11 g/t gold over 0.5
      metres;
      • 102.43 g/t gold over 0.7 metres (142.0 to 142.7 metres) in hole BR-19-86;
      • 16.65 g/t gold over 2.0 metres (167.5 to 169.5 metres) in hole BR-18-88 including 65.49 g/t gold over 0.5
      metres;
      • 5.36 g/t gold over 2.2 metres (321.1 to 323.3 metres) in hole BR-18-75; and
      • 17.79 g/t gold over 0.5 metres (192.8 to 193.3 metres) in hole BR-18-74.
      "The Infill Drill Program successfully infilled specific portions of the EG Gold System that were identified for
      development in the 2018 Preliminary Economic Assessment and intersected gold mineralization with grade and widths
      consistent with those encountered during earlier drill programs. It is anticipated that the density of drilling will upgrade
      these areas of the resource to the Indicated category and will be able to be included in the upcoming mineral resource
      update. In addition to these results, the Extension Drill Program successfully demonstrated that the Goldboro Deposit
      continues eastward at least 375 metres beyond the previous geological modelling. These drill results will likewise be
      used to model the deposit eastward and will be included in a resource update. Anaconda has completed 15,837 metres
      of diamond drilling since July of 2018 which will be included in the new resource update and published in a Feasibility
      Study expected to be completed in the fourth quarter of 2019. "
    • By pandeybhvsh
      If you are looking for a white-label BTC Mining Script then visit at zeligz web store. They provide an advanced and secured BTC Mining Script with an automated payment system. They have the full package for it at the lowest cost. They provide a demo, so before purchasing it you can try demo. For info visit the website and talk to the support team.
    • By pandeybhvsh
      Zeligz offers you to buy white-label ICO Script to build your ICO website.
      Buy ICO script to create your own white-label ICO website easily without any technical knowledge. You can manage your ICO Token sale with our ICO script without any problem. Their ICO script is completely secure bug-free and integrated with the most powerful Payment methods. Also, they have a team of experts who will customize the ICO script as per your requirements. The best part, they give 24*7 customer support. For more query check it now.
  • Topics

×
×
  • Create New...